← k27

7 cx5 mirror + drift report

Controller-owned check-ins. A saved feed, with its observation time visible.

Full visual report 001

Confirmed drift findings

Idle means the task is not currently running; it does not prove the whole project is complete. Unknown mirrors, shadows and model settings remain unknown. No background conversation is inferred.

Controller contract